Every topic through three lenses: policy, process, technical. Pick a family, then click any control to light up its mappings.
432 controls · 20 families · 2214 mapped pairs
Frameworks
Family
Lens
Sekit CSF · Backup & Recovery
ISO/IEC 27001:2022 · Annex A controls
Sekit CSF · Backup & Recovery · Policy
RCF-0250RTO/RPO definitions
Maximum acceptable recovery time and data loss are formally defined for all critical systems
ISO/IEC 27001:2022 · Annex A controls
Sekit's RTO/RPO definitions policy is part of A.5.1's topic-specific policy layer: it sets the maximum tolerable downtime and data loss allowed for each critical system.
Defining maximum tolerable downtime and data loss for each critical system is the business continuity target that ICT readiness must be built to meet, not the delivery capability itself.
This topic through the other lenses
Ask Sekura: “What evidence proves RCF-0250?”
Connect your AI · free MCP
https://sekit.ai/api/mcp/crosswalk
In Claude or ChatGPT, add a custom connector and paste this URL.
Sign in with your email to finish. Free, read-only, no organization required.